Mepco Demand Notice

In this article, we talk about the MEPCO demand notice online fee, how to pay it, and how to download or print the demand notice. We also explain how to track the demand notice online. If you have already applied for a new MEPCO connection and paid the charges, the next step is to check the status of your application and demand notice. You can do this by visiting the Customer Care Center or by using the online tracking method, which is easier and faster.

Check Your Mepco Latest Bill Online.

Mepco Demand Notice

Mepco Demand Notice By Categories Complete Guide in 2026

 Domestic Single-Phase Mepco Demand Notice charges 2026

The demand notice for Mepco domestic single-phase connections in 2026 depends on the location of the house.

  • For a single-phase demand notice in rural areas, the fee is between PKR 9,000 and 9,500.
  • Single Phase Demand Notice in urban areas, the fee is PKR 14,000 to 15,000. 
  • Single-Phase Demand Notice: If the house is in a private colony within an urban area, the fee ranges from PKR 18,000 to 20,000. 
  • The fee changes because of the location and type of area where the connection is needed.

Commercial Single-Phase MEPCO Demand Notice Fee 2026 Full Guide

In 2026, MEPCO will give commercial single-phase connections to shops and small businesses.

Industrial and Societies Connection Fees

MEPCO’s senior management sets the 2026 demand‑notice fees for industrial and housing‑society connections, and the charges are flexible—changing with each location, the infrastructure required, and the specific type of connection.

Check and Print Download  MEPCO Demand Notice through Online

  • Open the ENC official website for power New Connection.
  • On the page, click on the “Print DN (Demand Notice)” option.
  • Enter required information.
  • You can then download or print your online demand notice Mepco for payment.

Make sure to pay the fee before the due date to avoid any delays in getting your new connection in 2026.

Demand Notice Validity and Payment Procedure 

The MEPCO demand notice stays valid for 1 month in 2026. The fee can only be paid at specific bank branches .

  1. (United Bank Limited)
  2. (Allied Bank Limited)
  3. HBL (Habib Bank Limited)

Or other assigned banks. Always check the bank details written on your demand notice before paying to avoid any problems with the Mepco meter demand notice fee.

MEPCO Demand Notice Tracking By Online

After paying your MEPCO demand notice, you can track the status of your new electricity connection online.

  • Go to the ENC website at enc.com.pk.
  • On the homepage, click the “Track” button on the left side.
  • Then choose MEPCO as your company.
  • Enter your Reference Number or CNIC Number, and click Submit. You will see the details of your new connection and how many days are left in the process.
  • Make sure you enter the correct information to avoid any errors and wrong information and Mepco demand notice tracking and Mepco meter price.

Conclusion

You can track your MEPCO demand notice online and wapda demand notice fee through the Electricity New Connection (ENC) Portal or the official MEPCO website. If you face any issues while using the ENC site, you should contact the MEPCO complaint service or the assigned contact person for help.

A MEPCO demand notice is an important part of getting a new MEPCO electricity connection. Make sure to follow the steps, check all the details on the notice, and pay the required fee on time to avoid any delays. You can also check your MEPCO bill online from our MEPCO bill checker website anytime without any charge.

Frequently Asked Questions

How To Mepco Demand Notice Check Online?

You can check the demand notice online by visiting the ENC official website and entering your CNIC number, or by entering your bill reference number and printing your Mepco demand notice online by visiting of Mepco official website.

How To Track The MEPCO Demand Notice Online?

To track your WAPDA demand notice online, go to enc.com.pk and click on the “Track” option. From the list, choose MEPCO. Then type in your reference number or CNIC to see the status of your demand notice.

How Can I Print My MEPCO New Connection Demand Notice?

To print your MEPCO new connection demand notice, go to the website enc.com.pk. Click on the “Print DN” option. Then, enter your CNIC number or reference number. After that, you can download the demand notice as a PDF and print it.

How Long Is A MEPCO Demand Notice Valid?

A demand notice usually stays valid for 3 to 6 months. If you don’t pay the fee during this time, the notice can expire. When that happens, you might have to apply for a new demand notice again.